.jpg)
Prometheus had already built sophisticated Excel templates that reflected years of estimating experience, historical pricing, assumptions, formulas, and project knowledge. The company was not trying to replace a broken process, it wanted to make an established one easier to scale.
As the portfolio grew, valuable information remained distributed across individual estimates. Comparing projects could mean opening multiple files, locating historical pricing, and relying on experienced team members who knew where the right information lived1.
The challenge wasn't creating estimates in Excel. It was making years of estimating knowledge easier to find, compare, and reuse.
Prometheus preserved the estimating logic that already worked while reducing the friction around finding and comparing historical information.



Shifted to:

Centralizing historical information does not replace senior expertise. It changes where that expertise adds the most value, from finding information to interpreting it8 9.
Each completed project can add another layer of reusable estimating knowledge. Instead of allowing experience to remain trapped in individual files, a centralized system makes project history available for future decisions7 5.

The next project adds new knowledge to the cycle.
Cost analysis and benchmarking guidance emphasizes putting construction cost information on a comparable basis so historical project data can meaningfully inform cost planning and design development4.
A historical price without context is just a number. A historical price connected to a relevant project provides evidence.
Conceptual estimating happens while project variables are still evolving. Leadership may be evaluating feasibility, preliminary budgets, alternative concepts, historical comparisons, or whether an opportunity should continue into development3.
Faster access to relevant historical information allows the estimating team to spend less time searching for context and more time evaluating the decision itself.
The value isn't simply finding historical information faster. It's getting organizational knowledge into the decision sooner.
If several answers are no, the organization may not have a shortage of estimating knowledge. It may have a problem making that knowledge reusable.
Prometheus did not need to abandon Excel's estimating logic. It needed a way to make that accumulated knowledge more centralized, standardized, comparable, and accessible. Prometheus's existing Excel templates provided the foundation. Zebel helped turn that foundation into an estimating environment built around the company's actual workflow.
The result: the knowledge behind Prometheus's estimates became easier for the organization to find, compare, and put to work.
1. Kiziltas, S., & Akinci, B. (2009). Contextual information requirements of cost estimators from past construction projects. Journal of Construction Engineering and Management, 135(9), 841–852. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000053
2. Kartam, N. A. (1996). Making effective use of construction lessons learned in project life cycle. Journal of Construction Engineering and Management, 122(1), 14–21. https://doi.org/10.1061/(ASCE)0733-9364(1996)122:1(14)
3. AACE International. (2020). Skills and knowledge of cost engineering (6th ed.). https://web.aacei.org/docs/default-source/toc/toc_SK6.pdf
4. Royal Institution of Chartered Surveyors. (2024). Cost analysis and benchmarking (2nd ed.). https://www.rics.org/profession-standards/rics-standards-and-guidance/sector-standards/construction-standards/black-book/cost-analysis-and-benchmarking-2nd-edition
5. Carrillo, P., & Chinowsky, P. (2006). Exploiting knowledge management: The engineering and construction perspective. Journal of Management in Engineering, 22(1), 2–10. https://doi.org/10.1061/(ASCE)0742-597X(2006)22:1(2)
6. Oti, A. H., Tah, J. H. M., & Abanda, F. H. (2018). Integration of lessons learned knowledge in building information modeling. Journal of Construction Engineering and Management, 144(9), 04018081. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001537
7. Tan, H. C., Carrillo, P. M., & Anumba, C. J. (2012). Case study of knowledge management implementation in a medium-sized construction sector firm. Journal of Management in Engineering, 28(3), 338–347. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000109
8. Caldas, C. H., Gibson, G. E., Jr., Weerasooriya, R., & Yohe, A. M. (2009). Identification of effective management practices and technologies for lessons learned programs in the construction industry. Journal of Construction Engineering and Management, 135(6), 531–539. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000011
9. Tan, H. C., Carrillo, P. M., Anumba, C. J., Bouchlaghem, N., Kamara, J. M., & Udeaja, C. E. (2007). Development of a methodology for live capture and reuse of project knowledge in construction. Journal of Management in Engineering, 23(1), 18–26. https://doi.org/10.1061/(ASCE)0742-597X(2007)23:1(18)
10. Banerjee, S., Alsharef, A., Jaselskis, E. J., & Piratla, K. R. (2022). Review of current practices for implementing organization-wide knowledge repositories. In Construction Research Congress 2022. American Society of Civil Engineers. https://doi.org/10.1061/9780784483978.106
"Zebel has built the estimating tool that we’ve always wanted our Excel templates to be. Their team’s real world estimating experience is what makes their product so uniquely positioned to improve our existing estimating workflow. Most con-tech products don’t end up fitting into our workflow – there are few great products like Zebel that do."
SVP of Construction
If you’ve ever asked, “What is an ITB in construction?”—you’re not alone. An Invitation to Bid (ITB) is a foundational document used throughout the construction industry to initiate...
Managing a construction project—whether it’s a residential build, commercial complex, or public infrastructure—requires meticulous planning.
Understanding the various bid types is crucial for success when securing contracts in the construction industry. Navigating these bidding processes effectively can make all the difference...
Construction projects are known for their complexity, and even the best-planned ventures can experience cost overruns. These overruns aren’t just financial nuisances
We’ve crafted a solution born from our firsthand experiences as precon professionals. Elevating it to new heights, we’re proud to unveil Zebel—an amalgamation of years of expertise and dedicated R&D, now accessible to all.